Quality control, and what our certificates actually cover
Quality problems in stainless steel rarely come from the mill. They come from grade substitution, mixed heats, and thickness tolerance being read off a datasheet instead of a micrometer. Here is the process, and here is what our certificates do and do not say.
What we are certified for — and what we are not
| Document | Number | Valid until | What it actually covers |
|---|---|---|---|
| ISO 9001:2015 | 65626Q08163R010 | 2029-07-09 | Steel rolling processing and sales of steel and non-ferrous metals. It is a management system certificate — it does not certify a product. |
| CE — CPR verification | 6C220913.SCMQQ05 | 2027-09-12 | Voluntary third-party EC verification under Regulation (EU) 305/2011 for steel coil. It is not a PED certificate and it does not replace an EC Declaration of Conformity. |
| RoHS verification of conformity | CTGS2604010066R – 0081R | sample-based | 16 product lines tested to EN IEC 63000:2018 and EN 62321 series. Verification of submitted samples, to be read with the full test report. |
| Trademark 春康 | No. 48728069 | 2031-03-20 | Class 6: steel bar, plate, pipe, tube, alloy, structures, building materials. |
| Foreign trade operator registration | 04617787 | — | Export rights registered with the Chinese authorities. |
We do not hold PED 2014/68/EU, AD 2000, API 5L or API 5CT. If your specification requires any of those, we are the wrong supplier and it is better to know now.
The control sequence
- Incoming heat verification. Every heat is checked against its mill certificate before it enters production. Chemistry that does not match the certificate stops there.
- Positive material identification. PMI on incoming and finished material, in-house where the grade is within our analyser range and subcontracted where it is not. The report states which was used, so you are not left assuming everything was tested the same way.
- Dimensional inspection. Wall thickness and outside diameter measured at defined points, tolerance reported against ASTM A999 or EN 10216-5 depending on the order, with a dimensional inspection record issued against the measured values.
- Surface and finish. Pickling, passivation and polish checked against the order before packing.
- Packing verification. Marking, bundle tags, end protection and packing method checked against the packing list, with pre-shipment photographs as a standard step.
- Documentation release. MTC, inspection record, PMI and RoHS verification assembled before the container is sealed, not after you ask.
RoHS coverage: 16 product lines
| Product line | Certificate |
|---|---|
| Stainless steel medium plate | CTGS2604010066R |
| Steel pipe | CTGS2604010067R |
| Steel sheet and plate | CTGS2604010068R |
| Coated steel | CTGS2604010069R |
| Steel long products | CTGS2604010070R |
| Steel sections | CTGS2604010071R |
| Titanium | CTGS2604010072R |
| Copper | CTGS2604010073R |
| Stainless steel sheet | CTGS2604010074R |
| Stainless steel bar | CTGS2604010075R |
| Stainless steel flat bar | CTGS2604010076R |
| Stainless steel channel | CTGS2604010077R |
| Stainless steel strip | CTGS2604010078R |
| Stainless steel pipe | CTGS2604010079R |
| Stainless steel angle | CTGS2604010080R |
| Stainless steel coil | CTGS2604010081R |
Most Chinese steel suppliers hold RoHS for one or two product lines. Sixteen matters if you are selling into a consumer or construction channel that audits the material list line by line.
CE: which grades the verification covers
The ECM verification annex lists the construction-steel grades assessed, including 1.4306, 1.4307, 1.4401, 1.4404, 1.4510, 1.4511, 1.4521, 1.4526, 1.4529, 1.4362, 1.4462, duplex 2205 and 2207, S31803, S32304, S32750, S32550, plus the 200, 300, 400 and 900 series. If your application needs a grade outside that annex, the CE document does not cover it — ask before you assume.
Questions about quality
Do you issue EN 10204 3.1 certificates?
Yes, as standard with every lot, including heat number, chemical composition and mechanical properties. 2.2 is available for non-pressure applications on request.
Is PMI done in-house?
In-house on incoming and finished material, subcontracted for grades outside our analyser range. The report states which was used.
What is the claim window?
Notify us within 3 to 7 days of arrival, with the heat number and photographs. Claims are handled against the retained sample and the inspection record, which is why both exist.
Can I see the RoHS report for my product line?
Yes. Each product line has its own certificate number, listed above. Ask for the report that matches what you are buying rather than a general statement.
Does ISO 9001 mean the product is certified?
No. ISO 9001 certifies the management system. Product conformity is what the mill test certificate states, and the two documents answer different questions.