CHUNKANGStainless steel & non-ferrous metals · Shandong, China
Home / Quality control

Quality control, and what our certificates actually cover

Quality problems in stainless steel rarely come from the mill. They come from grade substitution, mixed heats, and thickness tolerance being read off a datasheet instead of a micrometer. Here is the process, and here is what our certificates do and do not say.

What we are certified for — and what we are not

DocumentNumberValid untilWhat it actually covers
ISO 9001:201565626Q08163R0102029-07-09Steel rolling processing and sales of steel and non-ferrous metals. It is a management system certificate — it does not certify a product.
CE — CPR verification6C220913.SCMQQ052027-09-12Voluntary third-party EC verification under Regulation (EU) 305/2011 for steel coil. It is not a PED certificate and it does not replace an EC Declaration of Conformity.
RoHS verification of conformityCTGS2604010066R – 0081Rsample-based16 product lines tested to EN IEC 63000:2018 and EN 62321 series. Verification of submitted samples, to be read with the full test report.
Trademark 春康No. 487280692031-03-20Class 6: steel bar, plate, pipe, tube, alloy, structures, building materials.
Foreign trade operator registration04617787—Export rights registered with the Chinese authorities.

We do not hold PED 2014/68/EU, AD 2000, API 5L or API 5CT. If your specification requires any of those, we are the wrong supplier and it is better to know now.

The control sequence

  1. Incoming heat verification. Every heat is checked against its mill certificate before it enters production. Chemistry that does not match the certificate stops there.
  2. Positive material identification. PMI on incoming and finished material, in-house where the grade is within our analyser range and subcontracted where it is not. The report states which was used, so you are not left assuming everything was tested the same way.
  3. Dimensional inspection. Wall thickness and outside diameter measured at defined points, tolerance reported against ASTM A999 or EN 10216-5 depending on the order, with a dimensional inspection record issued against the measured values.
  4. Surface and finish. Pickling, passivation and polish checked against the order before packing.
  5. Packing verification. Marking, bundle tags, end protection and packing method checked against the packing list, with pre-shipment photographs as a standard step.
  6. Documentation release. MTC, inspection record, PMI and RoHS verification assembled before the container is sealed, not after you ask.

RoHS coverage: 16 product lines

Product lineCertificate
Stainless steel medium plateCTGS2604010066R
Steel pipeCTGS2604010067R
Steel sheet and plateCTGS2604010068R
Coated steelCTGS2604010069R
Steel long productsCTGS2604010070R
Steel sectionsCTGS2604010071R
TitaniumCTGS2604010072R
CopperCTGS2604010073R
Stainless steel sheetCTGS2604010074R
Stainless steel barCTGS2604010075R
Stainless steel flat barCTGS2604010076R
Stainless steel channelCTGS2604010077R
Stainless steel stripCTGS2604010078R
Stainless steel pipeCTGS2604010079R
Stainless steel angleCTGS2604010080R
Stainless steel coilCTGS2604010081R

Most Chinese steel suppliers hold RoHS for one or two product lines. Sixteen matters if you are selling into a consumer or construction channel that audits the material list line by line.

CE: which grades the verification covers

The ECM verification annex lists the construction-steel grades assessed, including 1.4306, 1.4307, 1.4401, 1.4404, 1.4510, 1.4511, 1.4521, 1.4526, 1.4529, 1.4362, 1.4462, duplex 2205 and 2207, S31803, S32304, S32750, S32550, plus the 200, 300, 400 and 900 series. If your application needs a grade outside that annex, the CE document does not cover it — ask before you assume.

Questions about quality

Do you issue EN 10204 3.1 certificates?

Yes, as standard with every lot, including heat number, chemical composition and mechanical properties. 2.2 is available for non-pressure applications on request.

Is PMI done in-house?

In-house on incoming and finished material, subcontracted for grades outside our analyser range. The report states which was used.

What is the claim window?

Notify us within 3 to 7 days of arrival, with the heat number and photographs. Claims are handled against the retained sample and the inspection record, which is why both exist.

Can I see the RoHS report for my product line?

Yes. Each product line has its own certificate number, listed above. Ask for the report that matches what you are buying rather than a general statement.

Does ISO 9001 mean the product is certified?

No. ISO 9001 certifies the management system. Product conformity is what the mill test certificate states, and the two documents answer different questions.

How third-party inspection works here