Third-party inspection, without the theatre

Inspection is not an insult to the supplier and it is not a guarantee for the buyer. It is a checkpoint. Here is how it works on our orders, who pays, and where its limits are.

The sequence

  1. Tell us the scope. Visual, dimensional, PMI, mechanical, or destructive. Scope determines cost and duration more than the agency does.
  2. We book the agency by default — SGS, Bureau Veritas, Intertek or TÜV — or work with the one you appoint, including your own sourcing agent. The agency invoices you directly where possible, so the inspection is independent of our paperwork.
  3. Inspection is scheduled to finish before the planned shipment date so that a failed lot can be reworked or replaced instead of delaying the vessel.
  4. You get the agency's report, not our summary of it. A copy goes to us at the same time it goes to you.

What inspection can and cannot prove

It can proveIt cannot prove
The lot matches the specification on the day of inspectionThat every bundle in the container matches
Chemistry, dimensions and surface condition of the sampled piecesHow the material behaves after fabrication
That the markings and certificates correspond to the heats presentThat the mill certificate itself is genuine — that is a separate check
That packing and protection are as agreedThat nothing changes between inspection and loading

Sampling is the honest limitation. An agency inspecting a 25-tonne lot checks a sample, not every piece. If your application is safety-critical, specify the sampling plan rather than accepting the default.

Video inspection

If the order is too small to justify an agency, ask for video inspection instead: we walk the lot on camera, show the markings, measure with a calibrated gauge on screen, and send the footage with the documents. It is weaker evidence than an agency report, but it is better than nothing — and we offer it on any order, including trial lots.

Cost and timing

Cost depends on the agency's man-day rate and the scope you specify, and is usually booked several days before the planned shipment date. Complex lots with destructive testing take longer. We pass on the agency's own quotation rather than an estimate, so you can compare it against your agent's rate.

Questions about inspection

Who pays for inspection?

The buyer, paid to the agency. We do not mark it up and we do not take a commission from inspection bodies.

Can I use my own agent?

Yes. Many buyers use a sourcing agent or a local inspection company. We give them access to the lot and the documents.

What happens if inspection fails?

We rework or replace before shipment, or you cancel that lot. The point of inspecting before the vessel sails is that this is still possible.

How long does it take?

Typically a few days from booking to report for a standard visual and dimensional scope. Destructive or mechanical testing takes longer, and the agency will state the turnaround when it quotes.

Do you send photographs without inspection?

Yes, pre-shipment photographs of bundles, tags and markings are standard on every lot.